Parallel Factory MES User Guide Overview 日本語

Reference

Lists of statuses, numbering rules, the business date and a glossary. For reference when you are unsure during operation.

Statuses

Manufacturing orders

Status Meaning What you can do in this status
Draft Just registered Approve, change, cancel
Approved Approved Release to processes, cancel
Released Released into work orders Cancel only (the contents cannot be changed)
Completed Everything is completed —
Canceled Canceled —

Work orders

Status Meaning Next operation
Not dispatched Just released to processes Dispatch, start
Dispatched A worker and equipment have been assigned Start
Started The start of work has been recorded Register results
Completed Results have been registered Approve production completion
Approved Approved and finalized —
Canceled Follows the cancellation of the order —

Stock status (lots)

Status Meaning Main sources
Normal Can be used and shipped as usual Receiving, passed inspection
On hold Use is temporarily stopped Set manually, “On hold” action of a nonconformance
Awaiting inspection An inspection order has been issued Automatically when an inspection order is issued
Defective Failed inspection Automatically when the inspection judgment is “Fail”
To be scrapped Planned to be scrapped Set manually, “Scrap” action of a nonconformance

Inspection orders

Instructed → In progress → Judged → Approved (/ Canceled)

Nonconformances

Open (not handled) → Action instructed → Action completed → Closed

Picking orders, shipping orders and maintenance orders

Instructed → Completed (/ Canceled)

Stocktaking

Instructed (entering counts) → Finalized (/ Canceled)

Maintenance plans

Planned → Order issued → Completed (/ Canceled)

Trouble reports

Open → In progress → Completed

Shipment judgments

The judgment result is Approved / On hold / Special acceptance. Each has a status of Draft / Approved.


Numbering rules

All numbers are assigned as a sequence for each day, based on the business date.

Target Format Example
Manufacturing order number MO + date + 4-digit sequence MO20260501-0001
Lot number Product code + date + 3-digit sequence PRD-100-20260501-001
Picking order number PK + date + 4-digit sequence PK20260501-0001
Shipment number SH + date + 4-digit sequence SH20260501-0001
Stocktake number ST + date + 4-digit sequence ST20260501-0001
Inspection order number IN + date + 4-digit sequence IN20260501-0001
Nonconformance number NC + date + 4-digit sequence NC20260501-0001
Maintenance order number MT + date + 4-digit sequence MT20260501-0001
Shipment judgment number SJ + date + 4-digit sequence SJ20260501-0001

When receiving, a lot number is assigned automatically if the field is left blank. To use the supplier’s lot number, type or scan it.


Business date (production date)

Daily totals and numbering use the business date, not the calendar date.

  • The default boundary time is 6:00 a.m.
  • Times before 6:00 a.m. are treated as the previous day’s production date.
  • Example: actuals at 3:00 a.m. on May 2 → the production date is “May 1”

This keeps night-shift actuals that cross midnight together under one production date. The boundary time can be changed in the settings (Server deployment and settings).

The business date is used for numbering and for the period in quality analysis.


Main business rules

Rule Details
Release to processes needs a routing An order cannot be released to processes unless a routing (BOP) is registered for the product
No release without approval A manufacturing order can be released to processes only when it is “Approved”
Process order is not enforced A later process can be started even if the previous one has not finished. The start sequence is managed by dispatching
Inventory is added in the final process When results are registered in the last process of the routing, the good qty is put away as the output lot
Backflushing is based on planned materials Of the order’s planned materials, the components used in that process are consumed automatically, first in first out, by unit quantity × (good qty + defect qty) (alternate parts are not deducted)
Picking is first in, first out Allocation is automatic, earliest expiry first
Shipping needs a shipment judgment A shipment cannot be carried out without an approved “Approved” or “Special acceptance” judgment
Approval is single-step Each approval is finalized with one approval operation (there is no multi-step workflow)
Corrections need a reason Quantity adjustments and inspection result corrections require a reason, which is recorded in the audit log
Records cannot be erased The audit log is only ever added to; individual records cannot be changed or deleted. Only entries older than the retention period (5 years by default) can be deleted in bulk by an administrator, with a reason (Audit log)

Functions and screens

Every function can be operated from the screens. If you cannot find the operation you want, here is where to start.

What you want to do Screen
Record the component lots consumed, one at a time Material consumption on Record Results
Keep manufacturing conditions such as temperature and speed Process condition data on Record Results
Record work time (direct / indirect) Work Time
Correct registered results Correcting results on Record Results
Correct the quantity or due date of an order Change in the manufacturing order details
Cancel an inspection order issued by mistake Cancel inspection order in the inspection details
Follow how a work order progressed Status history on Record Results
Instruct a transport between processes and then carry it out Transfer Orders

Glossary

Term Meaning
Manufacturing order The unit “make this many of this product”. Product × quantity
Work order A manufacturing order broken down by process. Product × process
Release to processes Breaking a manufacturing order down into work orders based on the routing
Dispatching Assigning a worker, equipment and start sequence to a work order
MBOM The manufacturing bill of materials. Child products and quantities per unit of the parent
Routing (BOP) The order of processes, and for each process the standard time, required skills, equipment and tools
BOE Equipment information linked to the routing
Output lot The product-side lot assigned when a manufacturing order is released to processes
Backflush Calculating component consumption automatically from the MBOM and the completed quantity, and deducting it from inventory
Setup Preparation before work (pre-setup) and clearing up after work (post-setup)
Special acceptance A judgment that allows use or shipment under conditions even though the goods are out of specification
Trace back Following back the component lots used in a product lot
Trace forward Following the product lots in which a component lot was used
Deviation / nonconformance An event that departs from specifications or procedures. Its handling is recorded in Nonconformances
HSE Health, Safety, Environment. Check items about health and safety
QCDS Quality / Cost / Delivery / Safety. The classification of trouble reports
Business date (production date) The date used for totals and numbering. By default the boundary is 6:00 a.m.