Reference
Lists of statuses, numbering rules, the business date and a glossary. For reference when you are unsure during operation.
Statuses
Manufacturing orders
| Status | Meaning | What you can do in this status |
|---|---|---|
| Draft | Just registered | Approve, change, cancel |
| Approved | Approved | Release to processes, cancel |
| Released | Released into work orders | Cancel only (the contents cannot be changed) |
| Completed | Everything is completed | — |
| Canceled | Canceled | — |
Work orders
| Status | Meaning | Next operation |
|---|---|---|
| Not dispatched | Just released to processes | Dispatch, start |
| Dispatched | A worker and equipment have been assigned | Start |
| Started | The start of work has been recorded | Register results |
| Completed | Results have been registered | Approve production completion |
| Approved | Approved and finalized | — |
| Canceled | Follows the cancellation of the order | — |
Stock status (lots)
| Status | Meaning | Main sources |
|---|---|---|
| Normal | Can be used and shipped as usual | Receiving, passed inspection |
| On hold | Use is temporarily stopped | Set manually, “On hold” action of a nonconformance |
| Awaiting inspection | An inspection order has been issued | Automatically when an inspection order is issued |
| Defective | Failed inspection | Automatically when the inspection judgment is “Fail” |
| To be scrapped | Planned to be scrapped | Set manually, “Scrap” action of a nonconformance |
Inspection orders
Instructed → In progress → Judged → Approved (/ Canceled)
Nonconformances
Open (not handled) → Action instructed → Action completed → Closed
Picking orders, shipping orders and maintenance orders
Instructed → Completed (/ Canceled)
Stocktaking
Instructed (entering counts) → Finalized (/ Canceled)
Maintenance plans
Planned → Order issued → Completed (/ Canceled)
Trouble reports
Open → In progress → Completed
Shipment judgments
The judgment result is Approved / On hold / Special acceptance. Each has a status of Draft / Approved.
Numbering rules
All numbers are assigned as a sequence for each day, based on the business date.
| Target | Format | Example |
|---|---|---|
| Manufacturing order number | MO + date + 4-digit sequence |
MO20260501-0001 |
| Lot number | Product code + date + 3-digit sequence | PRD-100-20260501-001 |
| Picking order number | PK + date + 4-digit sequence |
PK20260501-0001 |
| Shipment number | SH + date + 4-digit sequence |
SH20260501-0001 |
| Stocktake number | ST + date + 4-digit sequence |
ST20260501-0001 |
| Inspection order number | IN + date + 4-digit sequence |
IN20260501-0001 |
| Nonconformance number | NC + date + 4-digit sequence |
NC20260501-0001 |
| Maintenance order number | MT + date + 4-digit sequence |
MT20260501-0001 |
| Shipment judgment number | SJ + date + 4-digit sequence |
SJ20260501-0001 |
When receiving, a lot number is assigned automatically if the field is left blank. To use the supplier’s lot number, type or scan it.
Business date (production date)
Daily totals and numbering use the business date, not the calendar date.
- The default boundary time is 6:00 a.m.
- Times before 6:00 a.m. are treated as the previous day’s production date.
- Example: actuals at 3:00 a.m. on May 2 → the production date is “May 1”
This keeps night-shift actuals that cross midnight together under one production date. The boundary time can be changed in the settings (Server deployment and settings).
The business date is used for numbering and for the period in quality analysis.
Main business rules
| Rule | Details |
|---|---|
| Release to processes needs a routing | An order cannot be released to processes unless a routing (BOP) is registered for the product |
| No release without approval | A manufacturing order can be released to processes only when it is “Approved” |
| Process order is not enforced | A later process can be started even if the previous one has not finished. The start sequence is managed by dispatching |
| Inventory is added in the final process | When results are registered in the last process of the routing, the good qty is put away as the output lot |
| Backflushing is based on planned materials | Of the order’s planned materials, the components used in that process are consumed automatically, first in first out, by unit quantity × (good qty + defect qty) (alternate parts are not deducted) |
| Picking is first in, first out | Allocation is automatic, earliest expiry first |
| Shipping needs a shipment judgment | A shipment cannot be carried out without an approved “Approved” or “Special acceptance” judgment |
| Approval is single-step | Each approval is finalized with one approval operation (there is no multi-step workflow) |
| Corrections need a reason | Quantity adjustments and inspection result corrections require a reason, which is recorded in the audit log |
| Records cannot be erased | The audit log is only ever added to; individual records cannot be changed or deleted. Only entries older than the retention period (5 years by default) can be deleted in bulk by an administrator, with a reason (Audit log) |
Functions and screens
Every function can be operated from the screens. If you cannot find the operation you want, here is where to start.
| What you want to do | Screen |
|---|---|
| Record the component lots consumed, one at a time | Material consumption on Record Results |
| Keep manufacturing conditions such as temperature and speed | Process condition data on Record Results |
| Record work time (direct / indirect) | Work Time |
| Correct registered results | Correcting results on Record Results |
| Correct the quantity or due date of an order | Change in the manufacturing order details |
| Cancel an inspection order issued by mistake | Cancel inspection order in the inspection details |
| Follow how a work order progressed | Status history on Record Results |
| Instruct a transport between processes and then carry it out | Transfer Orders |
Glossary
| Term | Meaning |
|---|---|
| Manufacturing order | The unit “make this many of this product”. Product × quantity |
| Work order | A manufacturing order broken down by process. Product × process |
| Release to processes | Breaking a manufacturing order down into work orders based on the routing |
| Dispatching | Assigning a worker, equipment and start sequence to a work order |
| MBOM | The manufacturing bill of materials. Child products and quantities per unit of the parent |
| Routing (BOP) | The order of processes, and for each process the standard time, required skills, equipment and tools |
| BOE | Equipment information linked to the routing |
| Output lot | The product-side lot assigned when a manufacturing order is released to processes |
| Backflush | Calculating component consumption automatically from the MBOM and the completed quantity, and deducting it from inventory |
| Setup | Preparation before work (pre-setup) and clearing up after work (post-setup) |
| Special acceptance | A judgment that allows use or shipment under conditions even though the goods are out of specification |
| Trace back | Following back the component lots used in a product lot |
| Trace forward | Following the product lots in which a component lot was used |
| Deviation / nonconformance | An event that departs from specifications or procedures. Its handling is recorded in Nonconformances |
| HSE | Health, Safety, Environment. Check items about health and safety |
| QCDS | Quality / Cost / Delivery / Safety. The classification of trouble reports |
| Business date (production date) | The date used for totals and numbering. By default the boundary is 6:00 a.m. |